Untitled
Recent Posts
- India’s BrahMos-NG, a leap in defence strengthThe new Lucknow facility will exclusively produce BrahMos-NG, marking Uttar Pradesh’s growing role in defence manufacturing.
- No talks on Kashmir, terror will be met with Force: IndiaIndia has made its position clear: there will be no talks on Kashmir.
- Delhi-Amritsar Bullet Train on track for 2025 completionThe Delhi-Amritsar High-Speed Rail (DAMHSR) project is a proposed 465 km bullet train corridor connecting Delhi, Chandigarh, and Amritsar. Currently in the planning phase, the project aims to be completed by December 31, 2025.
- India’s BrahMos-NG, a leap in defence strength
What’s new at WeRIndia.com
News from 700+ sources
-
Woman bitten by snake prescribed dog bite injection in Jagatsinghpur hospital
-
287 orphaned kids adopted in Odisha in 2024-25: CARA
-
Navi Mumbai To Face 24-Hours Water Supply Shutdown; Check Details
-
Justice DK Shripad sworn in, strength of judges in Odisha HC goes up to 19
-
Reduction in forest cover and mining turn Talcher into a boiling cauldron
-
CENTAC opens UG non-NEET admission portal for 202526 academic year in Puducherry
-
WeRIndia – A News Aggregator
Visit werindia.com for all types of National | Business | World | Politics | Entertainment | Health related news and much more..
Leave a Reply